Every business has a design, whether or not anyone drew it. Somebody decides who takes on new work, who signs off a price, who sorts a problem on a job and who tells the customer. When those answers sit in one person’s head, the design works until that person is busy, away or ready to step back.
Organisational design is the work of making those answers deliberate. This article explains what organisational design (also called organisation design, or org design) covers, sets out a 10-step process in three stages, and looks at the structure choices and common challenges a growing business meets along the way.
What is organisational design?
Organisational design is the process of shaping how a business is organised to deliver its strategy: its structure, roles, decision rights, processes, systems and culture. It goes beyond redrawing the organisation chart to set out how work gets done, who makes which decisions and how people and resources are arranged to meet the business’s goals.
The Chartered Institute of Personnel and Development (CIPD) describes organisation design as aligning the shape and structure of an organisation with its strategy. In practice it means reviewing what the business needs to achieve, analysing the gap between how it works now and how it needs to work, and designing the changes that close that gap.
It covers more than the organisation chart. The CIPD lists systems, structures, people practices, reward, performance measures, policies, processes and culture among the things a design review looks at. A new chart on its own leaves those practices unchanged, so day-to-day decisions may carry on as before. Models for leading the people side of a restructure, including the McKinsey 7-S framework and the Bridges Transition Model, are compared in the guide to change management frameworks.
Organisational design vs structure, organisation development and operating models
Three related terms are worth separating:
- Organisational structure is one output of design: the roles, teams and reporting lines. Design is the process that decides them.
- Organisation development (OD) is a broad discipline. The CIPD describes it as a planned and systematic approach to sustained organisational performance through the involvement of people. In its organisation design factsheet, the CIPD draws a useful distinction rather than a fixed boundary: OD suits more self-contained, local issues and the ongoing upkeep of a design, while organisation design suits larger issues, where success in one area depends on practice elsewhere in the business.
- An operating model describes how the business organises its work to deliver what it sells: processes, organisation, locations, information, suppliers and management system. Structure is one part of it. The guide to what an operating model is and its parts covers it in more detail.
The organisational design process: 10 steps in three stages
The practical framework below brings organisational design into ten steps across three stages: diagnose, design and deliver. Each stage has a clear output before the next begins.
There is no single standard sequence. Practitioners divide the process in different ways; NHS Employers, for example, uses four stages: prepare, discover, design and evaluate. The framework here draws on that guidance and the CIPD’s, arranged for an owner-led business.
Diagnose
- Set the strategic objectives and the case for change
- Agree design principles
- Assess current ways of working
Design
- Map the work the business needs to do
- Define roles and decision rights
- Develop three or four design options
- Test the options and choose one
Deliver
- Plan the transition
- Communicate and implement
- Review and adjust
Diagnose: set the direction and assess current ways of working
Step 1: Set the strategic objectives and the case for change
Design starts from strategy, not from the current chart. The owner and management team agree what the business needs to achieve over the next two to three years: the work it wants to win, the margin it needs, the services it will grow or drop, and whether the owner’s own role is due to change.
The CIPD identifies three common triggers for a redesign: internal or external pressures that need a response, a change in strategy, goals or purpose, and a need to consolidate or reconfigure where practices no longer fit each other or the strategy. Naming the trigger keeps the work focused. A business moving from domestic installs into commercial heating, ventilation and air conditioning (HVAC) maintenance contracts has a different case for change from one that has simply grown from 15 to 60 people.
Output: a short written statement of the objectives and the reason for change.
Step 2: Agree design principles
Design principles are the requirements any proposed design must meet. NHS Employers describes them as guardrails, agreed with the people involved before any design work starts. Examples might be “decisions on pricing are made within a day without the owner”, “every job has one named person accountable from order to handover” or “service and installation work are scheduled from one place”.
Principles do two jobs. They turn the strategy into tests a design can pass or fail, and they make the later choice between options less personal, because each option is judged against agreed rules rather than preferences.
Output: a short list of written principles, each saying what the design should do and why.
Step 3: Assess current ways of working
This step maps how the business actually works today, not how the chart says it works. That covers the structure and the practices around it: who people really go to for decisions, where work waits, which roles are overloaded, which tasks fall between roles, and how systems, measures, meetings and pay shape what people do. The CIPD points to tools such as SWOT and PESTLE analysis, surveys, focus groups and internal audits for this kind of gap analysis, and to involving employees in the work.
The people who do the work can be a strong source here. Engineers, planners and office staff see hand-offs, delays and workarounds that may not reach the management team. Short interviews or a workshop with them give a truer picture than the chart alone.
One practical way to see this in a project-based business is to follow one job from enquiry to final invoice and note each hand-off and each decision. That is the subject of workflow architecture design for project-based businesses. The aim is also to identify strengths worth keeping, so that the redesign does not remove them.
This is also the point to record a baseline for the measures that will be used in step 10, such as how long a price takes to go out or how many decisions go to the owner each week. Without a starting figure, it is hard to tell later whether the new design has made a difference.
Output: a picture of current ways of working, their strengths, the gap against the objectives and principles, and baseline figures for the chosen measures.
Check your business: where your structure stands
- Are the business’s goals for the next two to three years written down and shared with the management team?
- Has the current structure been mapped as it actually works, including who people really go to for decisions?
- Is there an agreed reason for changing the structure, beyond “the business has grown”?
Three yes answers suggest the groundwork for a redesign is in place. A no or unsure answer points back to steps 1 to 3, which come before any change to the structure.
Design: roles, decision rights and structure options
Step 4: Map the work the business needs to do
Before drawing boxes, list the work. This means the activities and capabilities the future business needs, grouped into the main areas: winning work, planning and scheduling, delivery, service and maintenance, purchasing, finance, people and compliance. NHS Employers recommends mapping future activities and looking at future trends at this stage, rather than designing only for today’s workload.
For an installation business, this is the point to decide whether new activities, such as a planned maintenance offer or a move into solar PV and battery storage, need their own capability or can sit within existing teams.
Output: a list of activities and capabilities, grouped, with an estimate of the workload in each.
Step 5: Define roles and decision rights
Roles are built from the grouped work, not from the people currently in post. NHS Employers makes the same point: structure charts should be drawn around roles, not job holders. Each role gets a clear purpose, its main responsibilities and the decisions it can make without referring upwards.
Decision rights are particularly relevant where the owner currently makes most of the decisions. A responsibility matrix such as RACI (Responsible, Accountable, Consulted, Informed), which NHS Employers suggests for setting out governance, records who is responsible for each key task or decision and who is accountable for the outcome. In a growing business that can include who can approve a variation, who can commit labour to a job and who can agree a price below list.
RACI does not by itself set how far each person’s authority goes. That needs approval limits, also called delegated authority. For example, a project manager may approve variations up to an agreed value, with anything above it going to the operations director.
Output: role outlines, a RACI matrix and a schedule of approval limits.
Step 6: Develop three or four design options
NHS Employers recommends producing three or four design options rather than settling on the first idea. Options might differ in how work is grouped (by function, by service line, by customer type or by region), in the number of management layers, or in where shared services such as scheduling and purchasing sit. The structure types are covered in more detail further down.
Each option can show more than the chart: how governance works, where the key processes and hand-offs sit, what leadership roles it needs, which systems support it (such as job management, scheduling and reporting) and which performance measures each role will be judged on.
Output: three or four options, each with a chart, a short description, its main hand-offs, and the systems and measures that support it.
Step 7: Test the options and choose one
Each option is tested against the design principles agreed in step 2. NHS Employers, in its evaluate step, suggests stress-testing designs against scenarios such as a sharp rise in demand, and assessing the change against the current state using Goold and Campbell’s nine tests of organisation design. For an installation business, further scenarios might include a key manager leaving, the order book doubling or the largest customer being lost.
Practical tests matter as much as design quality. Can the business afford the roles each option needs? Does it have, or can it recruit, the managers to run it? Can it be put in place while jobs are still being delivered? An option that passes every design principle but needs three new managers the business cannot fund is unlikely to work in practice.
Testing options with some of the people who will work in the new structure, not only the management team, can show practical problems early, such as a hand-off that looks clean on paper but would not work on site.
Each option is likely to involve trade-offs. Recording why one option was chosen over the others helps when the decision is questioned later.
Output: the chosen design, with the reasons for choosing it.
Deliver: transition, communication and review
Step 8: Plan the transition
The plan sets out the order of change, timings, who leads each part and how day-to-day work continues during the move. Changes that affect people’s roles, reporting lines or terms need particular care. Where changes affect employees’ terms and conditions, Acas explains that changes to employment contracts must be agreed by both the worker and the employer. Where changes could lead to redundancies, GOV.UK sets out the rules on redundancy consultations, including collective consultation when 20 or more redundancies are proposed at one establishment within 90 days. The guide to organisational change management covers how these fit into a wider change.
Phasing helps in a business that cannot pause delivery. Decision rights and scheduling might change first, with reporting lines following once the new routines are settled.
Output: a phased transition plan with owners and dates.
Step 9: Communicate and implement
People need to know what is changing, why, what it means for them and when. The CIPD notes that good practice is to involve employees and use multi-disciplinary teams in design work. Where people have been involved since the diagnosis and option testing, this step is easier, because they have already heard the reasons for the change.
Implementation is also when supporting practices change: job descriptions, meeting rhythms, reporting, performance measures and, where needed, pay. The CIPD notes that redesigns made in response to outside pressure, such as restructuring to meet a budget cut, are often ineffective in the longer term when they ignore the performance, reward and culture changes needed alongside them.
Output: the new structure in place, with roles, decision rights and routines working.
Step 10: Review and adjust
A design is a set of assumptions until it has been tested in practice. Review it against the design principles and a small set of measures agreed in advance, compared with the baseline taken in step 3. NHS Employers groups measures into four areas: structural efficiency, operational effectiveness, strategic alignment, and talent and cultural health.
In an installation business, practical measures might include:
- the time taken to send a price after a survey;
- the number of jobs waiting for an approval;
- rework or return visits;
- gross margin by job or by division;
- the number of decisions escalated to the owner each week.
The CIPD describes organisation development as the ongoing work of maintaining and improving a design once it is in place. In practice that means planned reviews, at three and twelve months for example, and smaller adjustments as the business changes. The wider discipline, including the main interventions and the process behind them, is explained in what organisational development is.
Output: a review against the measures, and a list of adjustments.
| Free download: Organisational Design Plan |
|---|
| From Rostone Working Tools. A one-page planning sheet for the owner and management team: the ten steps in three stages, with prompts, outputs and space to note who does what by when. |
| Get the Organisational Design Plan |
Designing an organisation structure: functional, divisional, matrix or hybrid
Structures commonly group work in one of four ways. Each has strengths and weaknesses, and the right choice depends on the business’s strategy, size and the principles agreed in step 2.
- Functional structure: teams grouped by what they do, for example sales, operations, finance and purchasing. It is simple and builds specialist depth, but hand-offs between functions can slow jobs down, and the owner can end up as the only person who sees the whole job.
- Divisional structure: teams grouped by service line, customer type or region, for example separate installation and service divisions, or a domestic and a commercial division. Each division can focus on its market, at the cost of some duplication of roles.
- Matrix structure: people report along two lines, for example engineers reporting to a trade lead for standards and to a project manager for each job. It can balance specialist skill with job delivery, but needs clear decision rights to avoid conflicting instructions.
- Hybrid structure: a mix, such as divisions for installation and service with shared functions for finance, purchasing and scheduling. It keeps shared functions in one place while giving each service line its own focus.
Two other choices shape any structure. Span of control is the number of people reporting to one manager; too wide and managers cannot support their teams, too narrow and the business carries extra management cost. Layers are the number of management levels between the owner and the front line. Each extra layer adds management cost and another step for decisions to pass through, so the case for each layer is usually set out. Structure also has commercial consequences, covered in how organisational structure affects profitability.
The same choices apply across trades. An HVAC business might separate planned maintenance from installation; an electrical contracting business might divide commercial fit-out from testing and inspection; a renewables installer might group solar PV, battery storage and heat pump work by technology or by customer type.
Common organisational design challenges for growing businesses
The challenges below are common themes in organisational design. In an owner-led business they can show up as everyday symptoms before anyone calls them design problems.
- The owner as the hub. Decisions, problems and customer escalations route through one person. The business runs well when the owner is present and slows when they are not.
- Roles built around people. Over time, roles grow to fit the strengths of the person in them. That works until that person leaves, and the role cannot be filled as it stands.
- Unclear decision rights. Managers have titles but not the authority to act, so decisions wait or are made twice.
- Specialisation versus integration. Splitting work into specialist teams builds depth, but each split adds a hand-off. Shared working without clear ownership, on the other hand, can leave nobody accountable.
- Culture and habits. A new chart does not change how people work on its own. Meeting rhythms, measures and recognition need to change with it.
- Resistance to change. People may resist changes that affect their routine, status or role. Involving them in the design and explaining the reasons reduces uncertainty.
Some owner-led businesses bring in outside support to run a redesign alongside day-to-day delivery, for example through fractional COO and operating partner support, so that the change does not depend on the owner’s spare time.
Check your business: structure challenges
- Could each key role be filled as it stands if the person in it left?
- Can managers make the decisions in their own area without the owner’s sign-off?
- Do jobs pass between teams without waiting, for example from sales to operations?
Three yes answers suggest these particular problems are less evident. A no or unsure answer identifies an area to investigate in steps 1 to 3.
Organisational design and change management
Organisational design decides what the business should look like; change management is how people move from the old way of working to the new one and stay there. The two overlap in steps 8 to 10, and a strong design can still fail if the transition is rushed or poorly explained.
Change management covers how the change is communicated, how people are supported through it, how resistance is understood and handled, and how new routines are reinforced until they become normal. A design can stall at this point even when the design itself is sound; the article on why a target operating model fails in implementation looks at common causes.
Frequently asked questions
Organisational structure is the arrangement of roles, teams and reporting lines. Organisational design is the process that decides that structure, along with the systems, processes, decision rights and practices that make it work. Structure is one output of design.
In its organisation design factsheet, the CIPD presents it as a difference of scale, which is a useful distinction rather than a fixed boundary. Organisation design suits larger issues, where success in one area depends on practice elsewhere in the business; organisation development suits more local issues and the ongoing work of maintaining and improving a design once it is in place.
Design principles are the requirements any proposed design must meet, agreed before design work starts. NHS Employers describes them as guardrails. They turn the strategy into tests that each design option can be checked against.
The CIPD identifies three common triggers: internal or external pressures that need a response, a change in strategy, goals or purpose, and a need to consolidate or reconfigure where practices no longer fit each other or the strategy.
RACI stands for Responsible, Accountable, Consulted and Informed. It is a matrix that shows, for each key decision or task, who does the work, who owns the outcome, who is asked for input and who is told. It helps make decision rights clear in a new structure. Approval limits are recorded separately, to show how far each person’s authority extends.
A target operating model describes how the business will operate in future to deliver its strategy. NHS Employers describes it as a living model, revisited as conditions change, and notes that it is not an organisation chart or a fixed blueprint.
Sources
CIPD: Organisation design factsheet; Organisation development factsheet
NHS Employers: Understanding organisational design in the NHS